Fully Licensed & Insured
Satisfaction Guaranteed – We Do It Right The First Time 0475 455 080
BUILDING CODE & AS 3660.1 COMPLIANT

Pre-Construction Pest Management Perth and the Wheatbelt

AS 3660.1 compliant termite protection, physical penetration collars, sheet barriers, and underslab chemical soil treatments for builders, developers, and owner-builders across Perth and the Wheatbelt.

Pre-Construction Pest Management Perth and the Wheatbelt

Building Compliance & New Structure Termite Protection

Under the National Construction Code (NCC) of Australia and Australian Standard AS 3660.1, all new buildings, home extensions, slab penetrations, and structural additions in Western Australia must install a certified termite management system to protect against subterranean termites.

Subterranean termites can easily enter new structures through tiny shrinkage cracks in concrete slabs, gaps around plumbing penetrations, or unsealed expansion joints.

Peak Pest Control works directly with builders, concreters, owner-builders, and commercial developers. We install certified physical termite collars, sheet barriers, and chemical underslab soil treatments, issuing complete Certificate of Installation compliance documentation required for local council approval.

What Is Included

Plumbing Pipe Penetration Collars

Installation of stainless mesh or chemical-impregnated physical collars around all underslab plumbing penetrations.

Physical Sheet & Perimeter Barriers

Heavy-duty termite membranes installed along slab edges, retaining walls, and cold joints prior to brickwork.

Underslab Chemical Soil Treatments

Treated soil zones beneath slab pours compliant with AS 3660.1 to block subterranean termite movement.

Certificate of Compliance (Part A & B)

Official installation certificates issued promptly for building surveyor and council sign-off.

Our Treatment Process

1

Part A — Pre-Slab Pipe Collar Installation

We fit certified collars around all plumbing and electrical penetrations before the concrete slab is poured.

2

Part B — Perimeter & Slab Edge Protection

Installation of perimeter sheet barriers or reticulated chemical lines prior to brickwork/cladding.

3

Final Certification & Sign-Off

Issuance of Form 16 / Certificate of Installation for council building inspection sign-off.

Free Quote

Request a Quote

No obligation • Fast response from our Perth team

FAQs

Frequently Asked Questions

CALL NOW FREE QUOTE